Mount Victory Water System Improvements

Page Engineering, Inc. has been asked by the Village of Mount Victory to complete a Preliminary Engineering Report to assess the current and future water system needs.  The Village has identified the following system improvements to be studied:
  • Replacement of approximately 80% of the Water Distribution System(water main, water valves, fire hydrants, water service taps, and required surface restoration)
  • Installation of Remote Water Metering Devices
  • Replacement of Solid State Starters at Water Treatment Plant
  • Replacement of Water Meters
  • Replacement or Rehabilitation of  Water Tower
  • Well Field Improvements (piping, electrical, etc.)
  • Water Treatment Plant Upgrades